Testimonials
Skanska USA Inc.
“I have known Hany ElBanna for approximately 3 years. During
that time, I have had the opportunity to observe Hany’s
ability to produce well organized, logical, and well thought
out schedules for design-build and bid-build projects under
the extreme time constraints of a bid. He is an expert user of
Primavera scheduling software. His background in civil
engineering and construction management enables him to fully
consider the impacts of construction sequence, long-lead
items, and design reviews on the schedule. In fact, it’s his
direct input into the aggressive schedules for the Amazing
Bridge ($500M) and Mind-Blowing Freeway ($850M) that led to
contract wins for those award-winning projects. Any employer
would be lucky to have Hany join his team.”
Dennis M. Curtin
District Chief Estimator
Skanska
USA
Civil Southeast Inc.
Phone (757) 578-4128
Email:
dennis.curtin@skanska.com
HNTB Corporation
“During the Western Beltway SR 429 construction (2004 to
2006), Hany ElBanna provided monthly CPM schedule updates and
2-week look-ahead updates at each of the Weekly Construction
Meetings for each project. The roadway project included over 5
miles of limited access tollway with interchanges at US 192,
Sinclair Road, and at I-4. The toll plaza project included a
mainline plaza, twin gantries, and 6 ramp plazas with
staggered openings corresponding to the roadway and ramp
opening schedule of the Turnpike. Mr. ElBanna’s presentations
were professional with detailed descriptions and presented in
a format that was easy to understand and relate back to the
current updated CPM schedule. The combined projects had
approximately 20 plan revisions which were coordinated and
integrated into the construction schedule and still achieved
an opening to I-4 one week earlier than originally contracted.
The Engineer’s staff was very pleased with the cooperative
attitude and professional performance of Mr. ElBanna on the
Western Beltway projects.”
Rhett C. Leary, P.E.
Senior Project Engineer
I-4 / SR 408 Interchange
Phone: (407) 648-0476
Email:
rleary@hntb.com
Jacobs Engineering Group
"I worked with Hany on scheduling a $450M Design-Build under
the time constraints of a bid proposal. His ability to
utilize the tools available in Primavera to: filter, rearrange
and codify the activities, allowed us to quickly find ways to
tighten our belt and confidently submit our contract days
with minimal contingency. "
David A. Panlilio, PE, Design-Build PM
Office Director -
Bartow,
Florida
Phone: 813.977.3434
Email:
david.panlilio@jacobs.com
Florida's
Turnpike Expressway Authority
“Mr. ElBanna was leading the scheduling effort for the SR 429,
Western Beltway, Part C - Sections 1 and 2A and Toll
Facilities, from 2005 through final acceptance on May 1,
2007. These projects had final contract amounts of
$65,387,375 and $17,813,047. Mr. ElBanna prepared well
organized three week look ahead schedules of upcoming
activities, as well as, detail oriented monthly schedule
updates which he presented at the weekly progress meetings.”
Fernando Gomez, P.E.
Construction Project Manager
Turkey
Lake Service Plaza
Phone: 407-264-3841
Email:
fernando.gomez@dot.state.fl.us
Kiewit Southern Co.
“The team from Catalyst was quick to respond and provide
scheduling narratives and techniques to many of our toughest
owners up to their satisfaction.”
Jay Gosalia
Central FL Area Lead Estimator
Phone: 407 466 9361
Email:
Jay.gosalia@kiewit.com
Kraus-Manning Inc.
“I had the distinct pleasure of working with Mr. ElBanna from
the beginning of 2004 through August 2005. Amongst other
assignments, he was responsible for creating and maintaining
detailed and summary schedules for a variety of ongoing
projects being managed for Signature Flight Support
Corporation – the world’s largest Fixed Base Operator. Mr.
ElBanna created and maintained comprehensive and accurate
schedules to help manage those projects.”
Bill Youell
Senior Program Manager
Phone: (407) 251-0085 x209
Email:
byouell@kraus-manning.com
Highland Port Development Corporation
“Catalyst Contractors provided timely and pleasant customer
service and insight as they prepared a construction schedule
for a complex commercial and residential mixed-use project
that we were embarking on. With very little direction, and
very little regional knowledge of the project location,
Catalyst Contractors created a detailed project specific
budget that will ensure we meet our project deadlines and keep
the project on track.”
Nick Nassiff
Project Manager
Phone: 973-491-0403
Email:
nnassiff@highlandport.com
The International Center for Scheduling, Inc.
“Companies are never better than the people that drive them.
As Catalyst’s president, Hany ElBanna personally sets the
tone, character, and quality standards by which his
organization as a whole operates. I personally know Hany
to be an exceptionally-qualified Scheduling Practitioner, as
evidenced by his achievement of “IQ Consultant” status.
Globally, less than 3% of all individual applicants achieve
“ICS-Qualified (IQ) Consultant” status. This ranking is a
testament to his knowledge, skill, and experience as a
construction Scheduling Practitioner. We wish Hany and
Catalyst much good fortune in the years ahead.”
Murray
B. Woolf, PMP
President
Author of "Faster Construction Projects with CPM Scheduling"
McGraw-Hill, 2007
Phone: 877-427-5665
Email:
mwoolf@ics-global.com
|